Up, Up, Up and Away (in the heat)

Up, Up, Up and Away (in the heat)

Progress Update Eleven

We've progressed (quickly) to week 12 of the build - around abouts the half way mark. And this week we've seen progress in the courtyard with a detailed concrete pour including a set of stairs which will eventually gain access to the second storey. Plus a suspended concrete slab which resides directly above the kennel room for added sound protection.

Luke and his team (of brother Mark and nephew Braiden) have been sweating it out installing the lower and upper steel frame roof beams and trusses, carport and awnings - which Lisa has referred to as a Meccano Set. (Thats's them in the pool during smoko).

Author: WVS Admin
0 Comments
Article rating: No rating
The lower roof is locked & loaded

The lower roof is locked & loaded

Progress Update 10

It's been another great week onsite with the competion of the lower steel frame roof. Yesterday the team even managed to install the ceiling over the kennel room - which will eventually be conceted for added sound protection. 

There's also been more core fillling of internal block walls, and settng out of the reo in the outdoor courtyard, in preperation for more concrete being poured tomorrow. (It's very surprising the sheer volume the build is requiring. And we haven't even got to the ashphalt carpark yet, ha). 

Author: WVS Admin
0 Comments
Article rating: No rating
The second storey is up in a flash

The second storey is up in a flash

Progress Update Nine

It's week 10 here on "The Block" and it's been all systems GO for our builder and tradies. The steel frame has continued to progress at a Usain Bolt pace and today we're currenty peering into the soon-to-be residential home above the vet hospital. 

The site has experienced more earthworks and excavation out back to create Lisa's green thumb garden and drainage area. It's also seen several more smaller block retaining walls errected to the outdoor area. Plus the pool professionals have been in to clean, scrub, fix and polish the existing pool. 

Author: WVS Admin
0 Comments
Article rating: No rating
The steel frame goes up and we're (almost) in business

The steel frame goes up and we're (almost) in business

Progress Update Eight

It's only Wednesday which is half way into week nine of our build, but we were just so darn excited about our new hospital finally taking shape that we needed to share this post and pics with you asap. Luke and his team (namely his brother Mark) have been busy measuring and flicking out the lines for the frame. 

 

Author: WVS Admin
0 Comments
Article rating: No rating
Waterproofing, backfilling and the steel frame arrives

Waterproofing, backfilling and the steel frame arrives

Progress Update Seven

After last week's hiccup with excess water and a new retaining wall (thanks Master builders and AON), we're into week eight of the build with the slab firmly settled. We've had a significant amount of earth works still taking place out the back of the carpark - creating water diversions and garden beds plus the machines have been used to backfill the external house retaining walls.  

 

 